ST. PAUL’S ACADEMY ACTIVITY CENTER Conversion/Remodel, Bellingham, WA 2011 Conversion of former Boys and Girls Club to Little Epistle’s Preschool and Activity Center; Classrooms, Gymnasium, Chapel, Offices and support spaces, Three story + basement steel and metal frame brick and stucco veneer construction; Cost: $8.2M; Construction Documents through Permitting, Architect
ST. PAUL’S ACADEMY UPPER SCHOOL, Bellingham, WA 2002-2011 47,300 SF, (6-12) Middle and High School Classrooms, Science, Music, Art and Drama Laboratories, Multi-use Gymnasium, Chapel, Offices and support spaces, Three story + basement steel and metal frame brick and stucco veneer construction; Cost: $8.2M; Programming, Flow Diagrams, Conditional Use Application, Design through Construction Administration, Architect
ST. PAUL’S ACADEMY LOWER SCHOOL Conversion and Remodel, Bellingham, WA 2002-2006 (Formerly St. Paul’s Episcopal School and St. Paul’s Primary School) 2004: Conversion of 20,344 SF Office Building into a K-8 School; Classrooms, Commons, Play and Assembly/Chapel, Offices and support spaces; Cost: $400,000; Programming, Conditional Use Application, Design through Construction Administration, Architect 2006: Classroom Remodel; Design through Construction Administration, Architect
HILLCREST KID’S DAY CARE (Pre-School) Addition and Remodel, Bellingham, WA, 1999-2003 Classrooms (Used for Church School), Commons, Play Areas, Commercial Kitchen, Offices and support spaces; Walkout Basement; Programming, Flow Diagrams, Conditional Use Application, Design through Construction Administration, Architect
ST. PAUL’S PRIMARY SCHOOL, Bellingham, WA 1994-1996 Within St. Paul’s Episcopal Church Addition (See Churches) Little Epistle’s Pre-School and K-2 School: Classrooms, Commons, Play Areas, Office and support spaces; Walkout Basement and sunken Courtyard; Planning through Construction Documents, Project Architect (JSA) Programming and Construction Administration, Architect
Bellingham School District No. 501:
SE (Wade King) ELEMENTRARY SCHOOL SITE, Bellingham, WA, 2000 Site and Feasibility Study, Architect
The New BELLINGHAM HIGH SCHOOL, Renovation and Additions,Bellingham, WA 1997-1999 166,000 SF New and Reconstruction of Historic Facility; Classrooms, multiple Commons, Laboratories, Library, Theater with full fly Stage, Physical Education and Gymnasium Facilities, Food Service, Administrative Areas, support spaces and Site Development; Existing: One, two, and three story reinforced concrete structure, New: one, two and three story tilt-up concrete, masonry and steel construction ( Type II and Type VI Construction); Cost: $21 M; Planning through Construction Documents; Planning and Project Architect (ARA)
GENEVA ELEMENTARY SCHOOL Additions and Remodel, Bellingham, WA 1991 One story wood frame construction; Design through Construction Docs; Planning and Project Architect (JSA)
SILVER BEACH ELEMENTARY SCHOOL Additions & Remodel, Bellingham, WA 1992 New: 36,500 SF, Remodel: 12,900 SF; One and two story wood frame, brick veneer, construction; Cost: $3.1M; Design through Construction Documents; Project Architect (JSA)
Ferndale School District No. 502:
CUSTER ELEMENTARY SCHOOL Limited Remodel, Custer, WA 2009, Architect
WINDWARD HIGH SCHOOL, Limited Remodel, Ferndale, WA, 2005, Architect
BEACH ELEMENTARY SCHOOL Remodel, Lummi Island, WA 2001, Feasibility Study, Architect
CUSTER ELEMENTARY SCHOOL Additions & Remodel, Custer, WA 2004, Feasibility Study, Architect
TRANSPORTATION/MAINTENANCE FACILITY Addition & Remodel, Ferndale, WA 2004, Architect
WINDWARD HIGH SCHOOL, Conversion/Remodel Ferndale, WA, 2003 New/Conversion: 17,000 SF (Conversion of Band Booster Bingo Hall into a High Tech High School); Classrooms, Work areas, Commons, Offices and support spaces; One story and mezzanine masonry and wood frame construction; Cost: $375,000; Programming through Construction Administration; Architect.
BEACH ELEMENTARY SCHOOL Limited Remodel, Lummi Island, WA 2001, Architect
FERNDALE HIGH SCHOOL, FINE ARTS BUILDING, Masonry Repair, Ferndale, WA 2000-2002 Earthquake masonry Repair, Cost: $190,166, Feasibility Study through Construction Admin., Architect
FERNDALE ALTERNATIVE HIGH SCHOOL, BLDG 500, Conversion/Remodel, Ferndale, WA 1997 800 SF, One story masonry facility for Art and Voc.Classrooms; Cost: $60,000; Project Architect (ARA)
Blaine School District No. 503:
BLAINE HIGH SCHOOL PERFORMING ARTS CENTER, Blaine, WA, 1994 17,600 SF Two story masonry and steel Multi-Use Theater, Stage, Lobby and Support Spaces; 1992, Cost: $1.7M; Planning through Construction Documents, Project Architect (JSA)
BLAINE HIGH SCHOOL GYMNASIUM Blaine, WA, 1994 Planning through Construction Documents, Project Architect (JSA)
BLAINE PRIMARY SCHOOL, Blaine, WA 1994 Technical Assistance and Site/Civil Design, Review and Site Architect (JSA)
BLAINE ATHLETIC PARK, Pipeline Road, Blaine, WA 1993 60 acre Athletic Park: Baseball, Softball, Football and Soccer Fields; Planning and Site/Civil Design; Project Architect (JSA)
BLAINE HIGH SCHOOL Additions,Blaine, WA 1992 13,900 SF, One Story Wood Frame Construction; Classrooms and Atria; Cost: $900,000; Planning through Construction Documents, Project Architect (JSA)
BLAINE ELEMENTARY SCHOOL Remodel, Blaine, WA 1991 One story masonry and wood frame construction; Design through Construction Documents; Project Architect (JSA)
Lynden School District No. 504:
LYNDEN HIGH SCHOOL Additions and Remodel,Lynden, WA 1992 New: 27,800 SF, Remodel: 5,100 SF: Classrooms, Laboratories, Physical Education annex, and Administrative areas; Multiple buildings: One story wood frame construction; Cost: $2.2M; Planning through Construction Documents; Project Architect (JSA)
Meridian School District No. 505:
MERIDIAN HIGH SCHOOL MULTI-USE CAFETERIA, Bellingham, WA 1992 15,000 SF Multi-Use Room, Theater, Stage, Kitchen, Lobby and Support Spaces; one story masonry and steel construction; Cost: $1.5M; Planning through Construction Docs, Project Architect (JSA)
MERIDIAN HIGH SCHOOL GYMNASIUM Bellingham, WA 1992 One story masonry and steel construction; Planning through Construction Documents, Project Architect (JSA)
MERIDIAN HIGH SCHOOL, Bellingham, WA 1992 Masterplan, Project Architect (JSA)
MERIDIAN INTERMEDIATE SCHOOL Addition & Remodel, Bellingham, WA, 1991 25,100 SF, One story wood frame construction; Cost: $1.6M; Technical Assistance and Site/Civil Design; Review and Site Architect (JSA)
Nooksack Valley School District No. 506:
NOOKSACK VALLEY JR/SR HIGH SCHOOL Additions and Remodel, Nooksack, WA 1993 New: 34,500 SF, Remodel: 75,400 SF; Multiple buildings, One story wood frame brick veneer construction; Cost: $3.9M; Programming through Construction Administration; Design and Project Architect (JSA)
NOOKSACK VALLEY HIGH THEATER-CAFETORIUM Nooksack, WA 1992 One story wood frame, brick veneer Construction; Construction Documents; Project Architect (JSA)
NOOKSACK PRIMARY SCHOOL, Nooksack, WA 1992 34,200 SF, One story wood frame construction; Cost: $2.7M; Technical Assistance and Site/Civil Design; Review and Site Architect (JSA)
Mt. Baker School District No. 507:
ACME ELEMENTARY SCHOOL Addition and Remodel,Acme, WA, 1994 Technical Assistance; Review Architect (JSA)
HARMONY ELEMENTARY SCHOOL Addition and Remodel, Bellingham, WA1994 Technical Assistance; Review Architect (JSA)
MT. BAKER JUNIOR/SENIOR HIGH SCHOOL Additions and Remodel,Deming, WA 1990 New: 102,380 SF, Remodel: 47,762 SF; Jr. High Classrooms, Gymnasium, and Offices: Sr. High Classrooms, Shops, Athletic Facilities, and Offices; Common Library, Multi-use Theater-Cafetorium and Food Services; One story masonry and wood frame/masonry veneer construction; Cost: $9.5M; Planning through Construction Documents, Planner and Project Architect (JSA)
Western Washington State University:
CARVER GYMNASIUM Re-roof, Bellingham, WA 1992
Cost: $90,000; Schematic Design through Construction Documents; Project Architect (JSA)
California Penal System:
DUEL VOCATIONAL INSTITUTE: CANTEEN, Remodel, Tracy, CA 1978 Design through Construction Documents; Project Manager (GMA) DUEL VOCATIONAL INSTITUTE: DAIRY, Remodel, Tracy, California 1978 Design through Construction Documents; Project Manager (GMA)
Lodi Unified School District:
Interim BARNETT-RANGE ELEMENTARY SCHOOL, Stockton, CA 1977 Cost: $320,000; Programming through Construction Administration; Designer and Principal (GA)
Linden Union High School:
LIBRARY, Linden, CA 1964-1965 New one story tilt-up concrete and wood frame construction; Space Planning and Interior Design; Designer/Drafter while student at Linden Union High School
SWIMMING POOL EQUIPMENT HOUSE AND REFRESHMENT CENTER, Linden, CA 1964 New masonry and wood frame facility for new pools, Design through Construction Documents, Designer/Drafter while student at Linden Union High School
Pacific Gas and Electric Company:
PG&E TRAINING CENTER Remodel,Stockton, CA 1988 300 SF Spa Testing Lab remodel, Cost: $30,000, Architect
PG&E WEATHERIZATION TRAINING CENTER, Remodel, Stockton, CA 1981 Cost: $90,000; Designer and Project Manager (GMA)
PG&E SOLAR TRAINING CENTER Conversion/Remodel, Stockton, CA 1979 6,400 SF: From Warehouse to Classroom, Shops and Offices; 1 story masonry and wood construction; Cost: $1M; Programming through Construction Administration; Designer and Project Manager (GMA)
Soledad School District:
New SOLEDAD HIGH SCHOOL, Soledad, CA 1991,Masterplan, Architect
South Dakota Children’s Home Society:
WEST RIVER CHILDREN’S CENTER SCHOOL Remodel, Rockerville, SD 1975 Masterplan and Design; Project Manager (SCA)
Stockton Unified School District:
MARTIN LUTHER KING ELEMENTARY SCHOOL Remodel, Stockton, CA 1981-1982, Cost: $461,250; One story wood frame construction; Technical Assistance; Reviewer (GMA)
WOODRUFF OCCUPATIONAL CENTER Wing “C” Addition, Stockton, CA 1975-1981 13,000 SF; New Business Classrooms and Commons; One story masonry and steel construction with active solar heating system: Cost: $1.1M; Programming through Construction Administration; Designer and Project Manager (GMA)