Home
G.R.R. Gideon
Projects:
Churches
Commercial
Offices
Residential
Schools
Other


BLAINE COMMUNITY ASSISTANCE CENTER, Blaine, WA 2010, Design, Architect

BLAINE FOOD BANK, Blaine, WA, 2010, Design, Architect

CIVIC FIELD ATHLETIC COMPLEX Additions and Renovations, Bellingham WA 2000-2003,
Football/Soccer Stadium Additions and Renovations, Baseball Field Addition, New Events Center, Parking Lot, Site Remodel and Renovation; Estimate: $10M; Conceptual Design & Feasibility Study, 2003 Bond Issue,
Design and Principal Architect (GA) (NBBJ Architects as Design Consultant)

McKENZIE COMMUNITY CENTER, Lummi Reservation, Bellingham WA, 2000
3,400 SF one story wood frame construction, Cost: $261,000; Architect (GA)

BLAINE HIGH SCHOOL GYMNASIUM, Blaine WA 1994
15,300 SF One and two story masonry and steel Gymnasium, Lobby and Support Spaces; Cost: $1.2M; Planning through Construction Documents, Project Architect (JSA)

BLAINE SCHOOL DISTRICT 60-ACRE ATHLETIC PARK, Blaine WA 1993
60 acre Athletic Facility: 2 baseball diamonds, 8 softball diamonds, 3 soccer/football fields, parking, and wetlands mitigation; Cost: $1.1M; Planning through Construction Documents, Design and Project Architect (JSA)

MERIDIAN HIGH SCHOOL GYMNASIUM Addition, Bellingham WA 1991
22,800 SF One and two story tilt-up concrete and steel Gymnasium, Lobby and Support Spaces; Cost: $1.4M; Planning through Construction Documents, Design and Project Architect (JSA)

COMMUNITY CENTER, The Salvation Army Corps, Additions & Remodel, Stockton CA, 1983
New: 10,368 SF: Nave/Sanctuary, Multi-use Overflow, Multi-use Classrooms, Offices & Courtyards,Remodel: 7,202 SF: Multi-use Gymnasium, Activity Rooms;  One story Masonry and wood frame construction; Cost: $750,000; Principal Architect (MGA) 

OAK PARK ICE SKATING ARENA Remodel,  Stockton CA, 1981; Project Manager  (GMA)

SWIMMING POOL EQUIPMENT & REFRESHMENT HOUSE, Linden CA 1964
New one story masonry and wood construction; Designer/Drafter, (student at Linden Union High School)