Home
G.R.R. Gideon
Projects:
Churches
Commercial
Offices
Residential
Schools
Other


(In recerse chronological order) 

Badger/Depot Offices, Lynden, WA, 2012, (Grad) 4 Units

STRAWBERRY MEADOWS Mixed Use, Lynden, WA, 2012, Architect (Grad) (See Residential)

BRENNER/GOOSMUS FARM Misc, Projects, Curlew, WA, 2010-2012
Design through Construction, Architect

CHELSEA LOFTS Mixed Use, Bellingham, WA, 2011-2012, Architect (Grad) (See Residential)

LA BOUNTY Commercial CENTER, Ferndale, WA, 2005, Conceptual Designs, Architect

SUNNYLAND SQUARE Shopping Center Renovation, Bellingham, WA 2004                        Conceptual Designs, Architect 

NIGHTLIFE (Underground) Night Club Conversion/Remodel, Bellingham, WA, 2003,
Construction Documents, Architect

MYKONOS GREEK RESTAURANT, Bellingham WA 1998
5,000 SF wood frame construction, Cost: $780,000
Programming through Construction Administration; Design and Project Architect (ARA) 

GRANITE FALLS FIRE STATION, Granite Falls, WA, 1998, Planning, Project Architect (ARA)

The New BELLINGHAM HIGH SCHOOL, Bellingham WA 1997-1999, (See Schools)
Food Service and Student Commons

NORTH WASHINGTON IMPLEMENT COMPANY, Lynden WA, 1997-1998
One and two story steel frame construction, Cost: $1.2M; Project Architect (ARA) 

HICKSON FIRE STATION Addition, Sedro Woolley WA, 1997, Project Architect (ARA)

HAGGEN/TOP FOODS Maintenance Recommendations, Various Locations, WA 1996, Architect

FAIRHAVEN BUILDING, Bellingham, WA, 1996, Schematic Design, Architect

BELLINGHAM BAY AQUARIUM, Bellingham, WA, 1993, Conceptual Design, Project Manager (JSA)

BELLINGHAM HERALD Reroof, Bellingham, WA 1993, Project Architect (JSA)

SILVER BEACH ELEMENTARY SCHOOL, Bellingham WA 1992 (See Schools):
Food Service and Multi-Use area

MERIDIAN HIGH SCHOOL MULTI-USE CAFETORIUM, Bellingham WA 1992 (See Schools)
Food Service and Multi-Use area

BLAINE ELEMENTARY SCHOOL, Blaine WA 1991(See Schools)
Food Service

Whatcom County CENTRAL GARAGE Materials Laboratory Addition, Bellingham WA 1991
Testing Laboratory, One story wood frame construction; Project Architect (JSA)

MT. BAKER JUNIOR/SENIOR HIGH SCHOOL, Deming WA 1990 (See Schools)
Food Service and Multi-Use area 

GOLDEN RULE CORDATA STORE, Bellingham WA, 1990, Project Architect (JSA) 

BELLINGHAM CRUISE TERMINAL, Bellingham WA, 1989, Construction Administration, (JSA) 

HEATH TECNA, Bellingham, WA 1989
180,000 SF manufacturing facility and offices; one and two story concrete and steel construction;
Programming through Construction Documents; Planning and Project Architect (JSA)

FLEMING HAYBARN Addition, Stockton CA 1988
1,500 SF: Historic Replication; wood frame, Cost: 28,000, Architect

PG&E MODESTO GARAGE Addition, Modesto CA, 1986, Architect

PG&E PHOENIX FORBAY GARAGE, Phoenix Forbay, CA, 1985, Architect (MGA)

PG&E TIGER CREEK LODGE Remodel, Tiger Creek, CA, 1985, Architect (MGA)

STOCKTON SAVINGS AND LOAN Manteca Branch Addition, Manteca CA 1983
One story masonry construction; 1983,Cost: $85,000; Documents Review, Review Architect (MGA)

WATERLOO PARK PLAZA Shopping Center, Stockton, CA, 1983
Masterplan & Conceptual Designs, Project Manager (GMA)

THORTON/WAGNER HEIGHTS Shopping CENTER, Stockton, CA, 1982
Masterplan & Conceptual Designs, Project Manager (GMA)

BANK OF AMERICA Wilson Way Agri-Center Branch, Stockton, CA, 1980-1982
1982: Limited Remodel
1980: 14,000 SF one and two story wood frame, stucco-clad construction; Cost: $981,006;
Design Development through Construction Documents, Project Manager (GMA)

FAIRGROUNDS INDUSTRIAL PARK Tenant Improvements, Stockton CA 1980-1982
1982: Technical Assistance; Principal (MGA)
1980: Technical Assistance; Reviewer (GMA)

PG&E SOLAR COLLECTOR Prototypes;, Stockton, CA, 1981, Project Manager (GMA)

BANK OF AMERICA Lincoln Village Branch Remodel, Stockton CA 1976 & 1981
1981: One and two story masonry and wood frame; Cost: $493,066
Construction Documents; Project Manager (GMA)
1976: Drive-up windows addition, Construction Documents; Project Manager (GMA)

FIRST INTERSTATE BANK Weberstown Branch, Stockton CA 1981
5,000 SF one story wood frame, stucco-clad construction; Cost: $423,390
Planning through Construction Administration; Project Manager (GMA)

OAK PARK ICE SKATING ARENA Remodel, Stockton, CA, 1981, Project Manager (GMA)

LIQUID CARBONIC CORPORATION Remodel, Martinez CA 1980, Project Manager (GMA)

DELTA CABLE SUPPLY, Addition and Remodel, Stockton CA 1980
Cost: $120,000; Technical Assistance; Reviewer (GMA)

STOCKTON SAVINGS And LOAN Pacific Avenue Branch, Stockton CA 1980
One story wood frame brick veneer construction; Cost: $351,313; Documents review, Manager (GMA)

STOCKTON SAVINGS And LOAN Robinhood Branch Remodel , Stockton CA 1980
One story masonry and wood construction; Cost: $116,771; Documents Review, Manager (GMA)

DELTA URBAN CENTER, Stockton, CA, 1989, Conceptual Designs, Project Manager (GMA)

PEAR TREE CORNER Office Building, Stockton, CA, 1979, Project Manager (GMA)

DUEL VOCATIONAL INSTITUTE: CANTEEN, Tracy CA 1978 (See Schools)
Food Service

DOWNTOWN RENEWAL, Stockton, CA, 1976, Conceptual Designs, Project Manager (GMA)

KNOWLES PLAZA Retail, Stockton CA 1975, Construction Documents, Project Manager (GMA)

MOUNT MORIAH TRAMWAY, Deadwood, SD, 1974
Design Development through Construction Documents; Project Manager (SCA)

NORTH STREET MOTEL, Rapid City, SD 197O, Feasibility/Conceptual Design, Principal (20:A/P)

MAZDA DEALERSHIP, Rapid City, SD, 1973, Designer and Principal (20:A/P)

ROCKERVILLE MOTEL & GENERAL STORE Renovation, Rockerville, SD, 1973
Feasibility Study/Conceptual Design, Designer and Principal (20:A/P)

KING'S INN OF TORRINGTON, Torrington, WY 1973
32,000 SF: 40 units, manager's unit, restaurant, lounge, 200 person banquet facility, indoor swimming pool, and boutique shops; one and two story masonry and wood frame construction; Cost: $950,000; Programming through Construction Administration, Designer and Principal (20:A/P)

HACIENDA MOTEL, Gordon, NB 1972
15,300 SF: 23 units, manager's unit, restaurant, lounge, banquet facility, three story masonry and wood frame construction, Cost: $450,000, Programming through Construction Administration; Designer and Principal (GA/JHA)

KING'S INN Addition and Remodel, Pierre, SD 1972
New: 43,200 SF: 61 units, 3rd floor 1,000 person banquet facility with full kitchen; three story masonry and pre-stressed concrete construction; Remodel: 2,400 SF: Restaurant and Lobby, Cost: $1.3M; Programming through Construction Administration, Designer and Principal (GA/JHA)

VERMILLION NURSING HOME, Vermillion, SD, 1972, Principal (GA/JHA)

HILL HOUSE MOTOR HOTEL, Dillworth, MN, 1972, Feasibility/Concept, Principal (GA/JHA)

LEAD SKI LODGE, Lead, SD, 1972, Feasibility Study/Conceptual Design, Principal (GA/JHA)

STURGIS ROAD SHOPPING CENTER Addition, Rapid City SD 1971, Designer, Principal (GA/JHA)

TRAVELODGE, Rapid City, SD 197O, Feasibility Study/Conceptual Design, Principal (GA/JHA)

M&W MOTEL, Rapid City, SD 197O,, Feasibility Study/Conceptual Design, Principal (GA/JHA)

US Government MINERVA CENTER, Sharpe Army Depot, Lathrop CA 1965
Schematic Design through Construction Documents; Designer/Drafter (Student Intern Program)

US Government WAREHOUSE Remodel,, Sharpe Army Depot, Lathrop CA 1965
Schematic Design through Construction Documents; Designer/Drafter (Student Intern Program)

SWIMMING POOL EQUIPMENT HOUSE & REFRESHMENT CENTER, Linden, CA 1964 (See Schools) Design through Construction Documents, Designer/Drafter (Student at Linden Union High School)